舞台设计与Show Flow舞台设计与Show Flow

Stage Design and Show Flow

Toppers, Christmas Party of the Year - 2016

For over 12 years Dutch group 'The Toppers’ have been responsible for Holland’s biggest sing-along party of the year.

That was the challenge we were facing when we were asked for the first time to design both show flow and scenery for their Christmas concert in December 2016.

舞台设计与Show Flow

舞台设计与Show Flow

12多年来,荷兰集团“TopPress”负责荷兰最大的年度演唱会。

这是我们第一次被要求为他们2016年12月的圣诞音乐会设计表演流程和场景时所面临的挑战。

FINAL RESULT

In the end the show sold out 6 times and got great reviews. A great example of our 'concept to reality’ process.

最终结果

最后,演出卖完了6次,获得了好评。一个伟大的例子,我们的“概念到现实”的过程。

MAARTEN VAN DEN BERG

PROJECT MANAGER

After approval of all concepts we set out to get it all built, together with technical production company, Sightline. We also produced all print files, the actual facade that is the finishing touch of the set.

Every element had its own detail in shape and size, and were completely manufactured for quick build and transportation. This was very important because the whole set had to be fully taken down after the first show, and rebuilt, a week later, within a timespan of close to 36 hours.

马腾范登伯格

项目经理

经过所有概念的批准,我们着手把它全部建成,连同技术生产公司,视线。我们还生产了所有的打印文件,实际的外观,这是最后一组的触摸。

每一个元素都有自己的形状和大小的细节,完全是为了快速建造和运输而制造的。这是非常重要的,因为第一场演出结束后,整个场景必须全部拆除,一周后,在将近36个小时的时间内重建。

(0)

相关推荐