山东省MedAccred -AC8121电子电缆和线束组件的审核标准 (15)
30.3 Assembly of Sleeving and Boots to Connector Bodies [ ]
30.4 Connector Damage Mandatory
30.5 Installation of Contacts and Sealing Plugs into Connectors Each question allows NA
30.6 Connector Testing Each question allows NA
31.0 Molding [ ]
31.1 Molding Process [ ]
31.2 Molding Inspection Mandatory if 31.0 Molding is Checked
32.0 Potting [ ]
32.1 Potting Process [ ]
32.2 Potting Inspection Mandatory if 32.0 Potting is Checked
33.0 Cable Assemblies / Wire Measurement Mandatory
34.0 Marking / Labeling Mandatory
35.0 Coaxial and Biaxial [ ]
35.1 Stripping, Soldering and Crimping of Coax and Biaxial Connector Assemblies [ ]
35.2 Solder Ferrule Pins [ ]
35.3 Press-Fit Coaxial Connectors [ ]
35.4 Semirigid Coax [ ]
35.5 Swage-Type Connectors [ ]
35.6 Soldering and Stripping of Biaxial Wire [ ]
36.0 Wire Bundle and Securing [ ]
36.1 General Mandatory if 36.0 Wire Bundle and Securing is checked.