江西省MedAccred _AC8121电子电缆和线束组件的审核标准 (30)
12.PURCHASING AND AUTHENTIC COMPONENT ASSURANCE
12.1 P- Is there a procedure that defines controls for ensuring procurement of authentic material from original manufacturers or their authorized distributors, supplier-approved independent distributors, or customer defined sources that includes:
12.1.1 P- Qualification criteria of Independent Distributors?YES/NO
12.1.2 P- Ongoing monitoring of Independent Distributor performance?YES/NO
12.1.3 P- Minimum required testing (i.e. as agreed to by customer and as appropriate) for components that are not traceable back to Original Component Manufacturer?YES/NO
12.1.4 P- The acceptance criteria for material procured from independent distributors such as listed in the AS5553?YES/NO
12.2 C- Are all material / components/ services purchased through the approved source?YES/NO
12.3 C- Is there evidence that:
12.3.1 C- Qualified Independent Distributors are being used for procurement of components?YES/NO
12.3.2 C- The ongoing monitoring of Independent Distributors performance?YES/NO
12.3.3 C- Minimum required testing for components that are not traceable back to Original Component Manufacturer is being performed?YES/NO
13.PROCESS CONTROL
13.1 P- Does a procedure exist to monitor internal nonconformance’s and customer rejections, and to initiate documented root cause analysis and corrective action with a defined timeframe?YES/NO