4.8 P- Is there a procedure that includes review of nonconforming material and requires the dispositioning of material YES/NO/NA
4.9 P- Is there a procedure which defines the process ensuring all customer and/or specification requirements are properly identified and implemented in the supplier’s manufacturing system and documentation?YES/NO
4.10 P- Is there a moisture control plan that meets the minimum requirements per J-STD-033 and/or J-STD-020 for all areas where moisture sensitive parts are handled, including production areas, rework areas, and kitting areas? YES/NO/NA
Audit Note: NA applies when no moisture-sensitive components are used.
4.11 C- During the course of the audit, was compliance with the existing quality management system demonstrated? YES/NO
4.12 C- Is there evidence that current work instructions are available and being used at each work station? YES/NO
4.13 C- Is there evidence that a build is not advanced without required signoffs and required completion of tests? YES/NO
4.14 C- Is there evidence that acceptance criteria are available at the work stations? YES/NO
4.15 C- Is there evidence that a system is in place to prevent Final QA approval before all necessary tests and process steps have been completed? YES/NO
4.16 C- Is there evidence that procedure for segregation and control of restricted materials is being followed throughout the entire manufacturing process? YES/NO
4.17 C- Have any non-conforming materials been identified and segregated per the procedure? YES/NO