中英详解集装箱船全船结构及紧固件【视频,图,文】

1. bridge castle front,驾驶台前侧
2. deck containers,甲板以上集装箱
3. foremast and mast top,大桅
4. forecastle,首楼
5. insulated containers in holds,
6. container refrigeration ducts,
7. double hull,双层船壳
8. passageway,过道

1球鼻首 bulbous bow

2艏尖舱 fore peaktank

3艏锚 bow anchor

4船首侧推器 bowthruster

5帆缆库 bo’sunstore room, hawser store room

6甲板下通道 underdeck passage

7第一集装箱货舱 no.1container hold

8第二集装箱货舱 no.2container hold

9第三集装箱货舱 no.3container hold

10第四集装箱货舱 no.4container hold

11第五集装箱货舱 no.5 container hold

12第六集装箱货舱 no.6 container hold

13第七集装箱货舱 no.7 container hold

14第八集装箱货舱 no.8 container hold

15机舱 engine room

16减摇鳍(稳定器)fin stabilizer

17舭龙骨 bilge keel

18舵机室 steering gear room

19低艉甲板 sunken stern deck

20舵 rudder

21中央螺旋桨 center line screw propeller

22两舷螺旋桨 side screw propeller

23轴毂 shaft bossing

24舷侧压载舱 side ballast tank

25深压载舱 deep ballast tank

26锚机 windlass

27前桅 fore mast

28桅杆瞭望台 crow’s nest

29系缆绞车 mooring winch

30舱口盖hatch cover

31货舱通气装置 ventilator of cargo hold

32电池导杆 cell guide

33舱口盖锁紧装置 flip-flop

34集装箱支撑 container support

35驾驶台 bridge

36救生筏 liferaft

37测向仪天线 direction finder antenna

38雷达扫描器 radar scanner

39信号旗杆 signal staff

40雷达桅 radar mast

41苏伊士运河灯 suez Canal signal light

42烟囱 funnel

43天线柱 antenna pole

44救生艇 lifeboat

45起重机 crane

4620英尺集装箱 20 ft container

4740英尺集装箱 40 ft container

48柴油发电机 diesel generator

49中央主柴油动力机 center line main dieselengine

50两舷主柴油动力机 side main diesel engine

51舷梯 accommodation ladder

52横舱壁 transverse bulkhead

53纵舱壁 longitudinal bulkhead

54机舱前端舱壁 fore bulkhead of engine room

55三角形艉封板 stern transom plate

1.Transom

2. Freefall lifeboat救生艇
3. Rudder + propeller舵和螺旋桨
4. Double side hull with fuel or ballast water双层船壳的油柜或水柜
5. Main engine主机
6. Accommodation生活区
7. Stores crane伙食吊
8. 20′ containers 20英尺集装箱
9. 40′ containers 40英尺集装箱
10. Walkway with container supports甲板通道
11. Double bottom with fuel or ballast water双层底
12. Bow thruster room艏侧推舱
13. Bulbous bow 球鼻艏
14. Bay 1 第一排位

1. Rudder 舵
2. Propeller 螺旋桨
3. Stem 船尾
4. Container with a length of 40 feet (FEU) on a 40′ stack
5. Container with a length of 20 feet (TEU) on a 20′ stack
6. Accommodation ladder 舷梯
7. Pilot or bunker door 引水门
8. Container guide rail 导轨
9. Row no 11 11行位
10. Row no 04
11. Tier no 08 第8层
12. Wing tank (water ballast)边柜
13. Service gallery 辅助走廊
14. Fixed stack
15. Movable stack
16. Bay no 15
17. Bay no 06
18. Tier no 86
19. Cells, hold 1 and 2, for containers with dangerous goods (explosives)
20. Container support
21. Breakwater 防浪板
22. Bulbous bow 球鼻艏

bays
rows

tiers

1.(container) cell,
2.movable track guide,
3.stacking frame,
4. brace,

Deck fittings

2. flush deck fitting, flush deck insert, flush foundation, circular foundation, stud bushing with plugging screw, screw plug,
5. socket, base stowing plate, base (… to be used with 21)
15. U-frame, shoe fitting, dovetailed base, companion fitting, dovetailed foundation (… to be used with13,17)
22,24. keyhole inserts (sunken, flush, raised),

Bottom fittings

1. pin bottom fitting, base stacking cone, cone plate, bottom stacking cone, bottom locator (… to be used with 2)
21. bottom stacking cone {… to be used with 5,12,22,23).
23. guide cone,

Stacking and locking fittings

4. stacking cone, intermediate stacking cone, stacker, stacking stud,
11. locking cone, pinstacker (with locking pin),
1416,17. twistlock, twist locking cone,
20. spacer stacking cone, compensating cone, spacer fitting (with cone top and bottom),
8,19,25. bridge fittings,
8. adjustable bridge fitting, clamp,
19. offset height clamp, compensatory bridge fitting, variable height clamp,
25. non-adjustable bruise fitting, double stacker, double intermediate stacking

Lashing points or lashing terminals

6. D-ring, lashing eye,

Lashing equipment

7,9 loadbinders,
7. chain lashing with chain lever,
9. lashing wire and turnbuckle, <
18. bulkhead bridge fitting,

other lashing equipment

10. lashing rod or bar, securing pads (penguin hook, elephant’s foot, eye hook), webbing,

top end transverse member (ou cross rail)
front wall panel
side wall panel
roof panel
door header
end door
hinge
rod guide
cam end guide
cam end
lever
door gasket
bottom rear cross member
corner fitting
fork lift pockets
bottom cross member
floor
bottom side rail
bottom end transverse member (bottom front cross
corner post
top side rail

built-in type (refrigeration unit fitted on request).
1.cold air supply,
2.air return,
3. coupling,
4. plenum chamber,
5. grating,
6. container door,

A. refrigeration duct (or ducting) system,
1a.Air supply duct,
2b. air return duct (to draw off violated air),

1. air duct, cold air duct, refrigeration duct/trunk,
2. coupling, pneumatic coupling, bellows piece,
3. rails,
4.transverse walkway,
5. insulated container,
6. hatch coaming,
7. deck strip,
8. passageway in the double hull,
9. fan unit (air supply),
10. cooler box, caisson; air cooler,
11. cooler box base, water collection tray, shut-off valves, temperature recorder, temperature regulator, brine pipe lead-in and lead-out drain plate (removal of defrosting water),

1. twistlock (for trailer chassis),
2. chain lashing,
3. chain hook-up unit, chain tensioner,
4. lashing pot, lash weldment, flush star fitting (receives chain terminated by elephant’s foot),
5. trailer support jack, trailer spindle support (with ratchet), jack stand,
6. wheel chocks,
7. lashing chain with pneumatic tensioner (operable by impact wrench or drive pneumatic wrench),
8. support trestle, trailer horse,
9. star dome,
10. turnbuckle, bottlescrew, straining screw,

container handling crane or portainer crane
traveiift
side-loader
skeleton flat car
traveiift
Quayside equipment
road chassis
straddle carrier
lift truck with top spreader

文章来源:信德海事

(0)

相关推荐

  • PSCO玩真的:明日-8月1,系固集中检查开始

    COVID-19疫情爆发以来,由于东京备忘录各成员国的PSC检查活动或多或少的受到影响,特别是我国的PSC检查尚未复工,而澳大利亚的PSCO检查力度一直没有减弱,导致大批高风险船舶在澳大利亚被滞留. ...

  • (刚刚)AMSA的这次滞留警告如何准确应对

    2018年8月,AMSA发布了2018年第3号marine notice,该notice针对船舶不规范装载货物,进行了通报,并强调今后货物系固.积载将成为澳大利亚检查的一个重点.事情的起因是阳明海运的 ...

  • 设计 | 集装箱的另一种打开方式

    建筑志(ID:jianzhuzhi) 作者:DE_L&Z 过去 集装箱都被广泛用于运输货物 如今 我们却看到了它的另一个形象 那就是集装箱建筑 集装箱建筑 材料价格低廉 并具有可持续性 在世界 ...

  • 详解电动车充电器的结构原理及修复

       一.充电器的结构与工作原理 (一)充电器的组成与工作原理    1.充电器的组成     充电器是给电动自行车蓄电池补充电能的装置.它主要由整流滤波电路.高压开关.电压变换.恒流.恒压及充电控制 ...

  • 16张图,详解最全英语语法 附经典例题—时态篇,实用干货哟

    英语共有十六种时态,其表现形式如下: 重点来啦!16大时态详解: 一.一般现在时 二.一般过去时 三.一般将来时 四.一般过去将来时 五.现在进行时 六.过去进行时 七.将来进行时 八.过去将来进行时 ...

  • 影视剪辑步骤详解(全是干货)

    影视剪辑这方面其实很简单,不要想的太复杂,我讲的是最简单的,按照这步骤思维来. 内容包括:手机/电脑找素材.去水印.剪辑软件.怎样防止搬运.剪辑思路,热门技巧. 1.手机找素材 手机都有自带的录屏功能 ...

  • 【杨维杰】董氏奇穴 穴位详解(全)

    索引查询穴位:部位总论一一手指部位 二二手掌部位三三前臂部位四四后臂部位五五脚部部位六六脚部部位七七小腿部位八八大腿部位九九耳部部位十十头面部位背腰部位胸腹部位B背面穴鼻翼穴博球穴C侧三里侧下三里肠门 ...

  • 设备打表找正对中方法详解

    单表对中找正的装架示意图 图1 为单表双打 使用单表双打对中法的前提条件 图2 图中:S-两转子轴头之间的距离:D-联轴节的外径. 前提条件:S≥D/2 轴端距离越大,联轴节的直径越小,计算就越准确, ...

  • 八字中暗合详解

    什么地支暗合,八字中暗合详解 什么地支暗合,所谓"暗合",就是"暗中苟合"的意思.地支中的暗合一般只有"通合"与"通禄合" ...

  • 多图详解变压器油枕的结构!

    筑龙给排水 1篇原创内容 公众号 来源:变电交流 如有侵权,请联系删除 油枕是用于变压器的一种储油装置,其作用是当变压器由于负荷增大,油温升高,油箱内油膨胀,这时过多的油就会流入油枕.反之温度降低时, ...

  • 基本面版功能详解 | LrC全解8

    这是本系列第8篇文章,本次我将进入修改照片模块的照片调整面板.Lightroom Classic的调整类面板和Camera Raw如出一辙,而后者我已经写了海量的文章,大家可以直接在公众号里回复&qu ...